Points model and threshold calculator (invented rules)
1. Score one lead
2. Calibrate the threshold on past leads
Enter past leads and contracts by score band, and how many leads your team can work over the same period.
Score at or above
Leads
Contracts
Rate % (95% interval)
% of leads
% of contracts
All example numbers are invented, not market data. The points, the 60-day linear decay, the 20-point cap on proposal views, the 100-point total cap and the fit floor are this page's own illustrative rules, not any vendor's. Decay removes an event's points in a straight line over the decay window. The threshold chosen is the lowest one whose passed leads fit the capacity. Entries accept 12,500 or 0,15; a value such as 1.000 is ambiguous and is rejected, so write 1 or 1000. Leave an event blank if it did not happen.