TMY to P90 calculator
Treat a typical-year energy figure as P50, then lower it by a year-to-year standard deviation that you supply.
The standard deviation (sigma) is your input, not a site value. The starting 3.0% is a placeholder for illustration. Take sigma from a multi-year weather series for your site, or from a yield report. This is a design aid, not a bankable yield assessment.
Examples:
Result
| Level | Factor (z) | Energy | Below P50 |
|---|---|---|---|
| P50 | 0 | - | 0.00% |
| P75 | - | - | - |
| P90 | - | - | - |
| P95 | - | - | - |
| P99 | - | - | - |
| Total sigma used | - |
| Values read from the box | - |
| Mean of the pasted years | - |
| Sample standard deviation of the pasted years | - |
| Your P50 figure against that mean | - |
With sigma at zero every level equals the typical-year figure. That is what a typical-year run alone implies.
Formula: Pxx = P50 x (1 - z x total sigma), with z = 0.6745, 1.2816, 1.6449 and 2.3263 for P75, P90, P95 and P99. Total sigma is the square root of the sum of the squares of the year-to-year sigma and the other terms. A normal distribution is assumed. The calculator does not read weather files or run a simulation. For the full uncertainty budget see the P50, P90 and P99 page.