SolarSoftwares
Book a demo

PVcase Ground Mount vs RatedPower (pvDesign)

On battery sizing and modelling, PVcase Ground Mount shows nothing found and RatedPower (pvDesign) shows “Advanced”. PVcase Ground Mount suits EPCs (build firms) designing very large solar farms in AutoCAD. RatedPower (pvDesign) suits teams that develop, own or build large solar farms with storage.

We do not name a winner. How we compared these

At a glance

Quick facts

Quick facts about PVcase Ground Mount and RatedPower (pvDesign)
FactPVcase Ground MountRatedPower (pvDesign)
Runs as Desktop Verified Cloud Verified
Free plan Not found Not found
Free trial Not found Not found
Apps it connects to 5 named 6 named
Verified strengths Solar design, 3D modelling, Shade analysis Verified Solar design, 3D modelling, Shade analysis Verified

Which should you choose?

Built from the fit ratings in each review. It is not a verdict.

Neither fits if you are

  • Home solar installers
  • Business (commercial) installers
  • Solar sales teams
  • O&M and asset teams
  • Both reviews rate these as a weak fit.

Pricing comparison

Both charge the same way. But neither one shows a price, so there are no two numbers to compare.

Pricing facts for PVcase Ground Mount and RatedPower (pvDesign), as each company shows them
FactPVcase Ground MountRatedPower (pvDesign)
Starting price Ask the company No public price Ask the company No public price
How it charges Quote only Quote only, per company subscription
Free plan Not found Not found
Free trial Not found Not found
Paid add-ons Not stated Enverus ONE Power Analyst (AI agent), 3D energy yield packages
Official pricing View PVcase Ground Mount pricing (opens in a new tab) View RatedPower (pvDesign) pricing (opens in a new tab)
Last checked 6 October 2026 6 October 2026

Each price is shown as the company writes it, and we never change one currency into another. What you pay also depends on how many users you have, the plan tier, contract length, setup, training and the apps you connect.

Feature-by-feature comparison

All 15 differences, the ones most likely to matter first.

Verified Company claim Not offered Not found Could not read No data yet
What the labels mean
  • Verified means we checked it on the company’s own website. The label links to the page.
  • Company claim means the company says so, but we could not check it.
  • Not offered means the company says it does not do this.
  • Not found means we looked on the company’s website and did not find it. That does not prove it is missing.
  • Could not read means we could not open the company’s page. It says nothing about the product.
  • No data yet means we have not recorded this fact for that product. It says nothing about the product.
  • Basic and Advanced show how deep the company says a feature goes.
PVcase Ground Mount and RatedPower (pvDesign), feature by feature
Feature PVcase Ground Mount RatedPower (pvDesign)
Battery sizing and modelling Not found : source for Battery sizing and modelling, opens in a new tab Advanced Verified : source for Battery sizing and modelling, opens in a new tab
Yearly power estimate Basic Verified : source for Yearly power estimate, opens in a new tab Advanced Verified : source for Yearly power estimate, opens in a new tab
Likely and worst-case power output (P50/P90) P50 is the output in a typical year. P90 is the output you can count on in a poor year. Not found : source for Likely and worst-case power output (P50/P90), opens in a new tab Basic Company claim : source for Likely and worst-case power output (P50/P90), opens in a new tab
Manual layout editing No data yet We have no fact on file for this product yet. That tells you nothing about the product. Not stated Verified : source for Manual layout editing, opens in a new tab
Site view from satellite or aerial images Not applicable Not its job : source for Site view from satellite or aerial images, opens in a new tab Advanced Verified : source for Site view from satellite or aerial images, opens in a new tab
Shading analysis Basic Verified : source for Shading analysis, opens in a new tab Advanced Verified : source for Shading analysis, opens in a new tab
Single-line diagram (the main wiring drawing) Not found : source for Single-line diagram (the main wiring drawing), opens in a new tab Basic Company claim : source for Single-line diagram (the main wiring drawing), opens in a new tab
Panel string sizing A string is a row of panels wired together to feed an inverter. Advanced Verified : source for Panel string sizing, opens in a new tab No data yet We have no fact on file for this product yet. That tells you nothing about the product.
Automatic panel layout Advanced Verified : source for Automatic panel layout, opens in a new tab Advanced Verified : source for Automatic panel layout, opens in a new tab
Energy report a bank will accept Lenders often ask an independent engineer (IE) to approve the power estimate. Basic Company claim : source for Energy report a bank will accept, opens in a new tab Basic Company claim : source for Energy report a bank will accept, opens in a new tab
Export to drawing programs (DXF/DWG files) DXF and DWG are file types that drawing programs open. Yes Verified : source for Export to drawing programs (DXF/DWG files), opens in a new tab Yes Verified : source for Export to drawing programs (DXF/DWG files), opens in a new tab
Ground-mount and sun-tracking layout Advanced Verified : source for Ground-mount and sun-tracking layout, opens in a new tab Advanced Verified : source for Ground-mount and sun-tracking layout, opens in a new tab
Named weather and sunlight data source Not found : source for Named weather and sunlight data source, opens in a new tab Not found : source for Named weather and sunlight data source, opens in a new tab
Electronic signature No data yet We have no fact on file for this product yet. That tells you nothing about the product. Yes Verified : source for Electronic signature, opens in a new tab
Proposal document Not applicable Not its job : source for Proposal document, opens in a new tab Advanced Verified : source for Proposal document, opens in a new tab
Payback and return calculation Not found : source for Payback and return calculation, opens in a new tab Advanced Verified : source for Payback and return calculation, opens in a new tab
Report and file export Advanced Verified : source for Report and file export, opens in a new tab No data yet We have no fact on file for this product yet. That tells you nothing about the product.
AI assistant (copilot) No data yet We have no fact on file for this product yet. That tells you nothing about the product. Company claims it Verified : source for AI assistant (copilot), opens in a new tab
Apps it connects to (named) 5 Verified : source for Apps it connects to (named), opens in a new tab 6 Verified : source for Apps it connects to (named), opens in a new tab
Public API (lets other apps connect) Basic Company claim : source for Public API (lets other apps connect), opens in a new tab Basic Company claim : source for Public API (lets other apps connect), opens in a new tab
Web application No data yet We have no fact on file for this product yet. That tells you nothing about the product. Yes Verified : source for Web application, opens in a new tab
How you get it Software Verified : source for How you get it, opens in a new tab Software Verified : source for How you get it, opens in a new tab
Starting price No price shown Not found : source for Starting price, opens in a new tab No price shown Not found : source for Starting price, opens in a new tab
Free plan Demo only, no trial Verified : source for Free plan, opens in a new tab Demo only, no trial Verified : source for Free plan, opens in a new tab
Price shown on its website Not published Verified : source for Price shown on its website, opens in a new tab Not published Verified : source for Price shown on its website, opens in a new tab
How it charges By quote Verified : source for How it charges, opens in a new tab By quote Verified : source for How it charges, opens in a new tab
Business and factory work C&I means commercial and industrial buildings. No Verified : source for Business and factory work, opens in a new tab No Verified : source for Business and factory work, opens in a new tab
Where it is sold Worldwide Verified : source for Where it is sold, opens in a new tab Worldwide Verified : source for Where it is sold, opens in a new tab
Status Active Verified : source for Status, opens in a new tab Active Verified : source for Status, opens in a new tab
Homes No Verified : source for Homes, opens in a new tab No Verified : source for Homes, opens in a new tab
Who it is sold to Large EPC firms and developers Verified : source for Who it is sold to, opens in a new tab Large EPC firms and developers Verified : source for Who it is sold to, opens in a new tab
Very large solar farms Utility-scale means plants that sell their power to the grid. Yes Verified : source for Very large solar farms, opens in a new tab Yes Verified : source for Very large solar farms, opens in a new tab

Scroll the table sideways to see both products. The feature names stay in place.

Where they are the same 17 facts
  • Automatic panel layout
  • Energy report a bank will accept
  • Export to drawing programs (DXF/DWG files)
  • Ground-mount and sun-tracking layout
  • Named weather and sunlight data source
  • Public API (lets other apps connect)
  • How you get it
  • Starting price
  • Free plan
  • Price shown on its website
  • How it charges
  • Business and factory work
  • Where it is sold
  • Status
  • Homes
  • Who it is sold to
  • Very large solar farms

Pros and cons

Alternatives

Instead of PVcase Ground Mount

Instead of RatedPower (pvDesign)

Common questions

What is the main difference between PVcase Ground Mount and RatedPower (pvDesign)?

They differ most on battery sizing and modelling. In total we found 15 differences and 17 things that are the same.

Which costs more, PVcase Ground Mount or RatedPower (pvDesign)?

Both use the same kind of pricing: by quote. PVcase Ground Mount does not show its price on its website. RatedPower (pvDesign) does not show its price on its website.

Is PVcase Ground Mount or RatedPower (pvDesign) better?

On battery sizing and modelling, PVcase Ground Mount shows nothing found and RatedPower (pvDesign) shows “Advanced”. We confirmed 11 features for RatedPower (pvDesign) on its website and 6 for PVcase Ground Mount. Main thing to weigh for PVcase Ground Mount: No public price, and you must own AutoCAD. Main thing to weigh for RatedPower (pvDesign): No public price, and key extras cost more. We do not name a winner, because the right one depends on what you need.

Do PVcase Ground Mount and RatedPower (pvDesign) have a free plan or a free trial?

PVcase Ground Mount: free plan: not found, free trial: not found. RatedPower (pvDesign): free plan: not found, free trial: not found. Plans listed: Basic, Advanced and Enterprise. Check what a free version leaves out.

Which apps should I check for PVcase Ground Mount and RatedPower (pvDesign)?

PVcase Ground Mount names 5 apps: AutoCAD, Civil 3D, PVsyst (export), PVcase Yield and PVcase Prospect. RatedPower (pvDesign) names 6 apps: PVsyst (export), AutoCAD .dwg export and import, Enverus PRISM site data, Your own GIS layers, Radiance (ray-tracing engine) and Upload your own .ond inverter files. Ask the company about any app not named.

How current is the information on this page?

Prices, plans and apps were read on 6 October 2026. In the table we read 14 facts on 6 October 2026, 4 facts on 28 September 2026 and 40 facts on 25 September 2026, each with its own source. The PVcase Ground Mount review lists 8 sources and the RatedPower (pvDesign) review lists 13. The reviews confirmed 6 of 12 features for PVcase Ground Mount and 11 of 15 for RatedPower (pvDesign) on the companies’ websites.

About this comparison

Last checked

Prices and plans come from each product’s review, checked on this date (the later of the two). Other feature facts in the table were last checked on 28 September 2026.

Companies change prices and features without warning. Check current terms with the company before you decide.

Built from our list of facts, never by hand. We only publish a pair with at least five real differences, and we turned down 61 others.

How we build comparisons

See the software on your shortlist.

Tell the SolarSoftwares team what you want in your solar software.

Your request goes by email to the SolarSoftwares team. A demo time is set only after we reply.