SolarSoftwares
Book a demo

PVsyst vs Solargis Evaluate

PVsyst starts at CHF 700 per license per year. Solargis Evaluate starts at EUR 12,000 per subscription. PVsyst suits engineers who need a detailed energy report for a lender or an investor. Solargis Evaluate suits teams that plan very large solar farms and need reports for lenders.

We do not name a winner. How we compared these

PVsyst Solar simulation software
Best for
Business (commercial) installers, Solar farm developers
Starting price
CHF 700 per license per year Verified
Stands out for
Deep, detailed energy modelling for any size of system, at CHF 700 a year.
Main consideration
Desktop only, one license per computer, and no sales tools.

At a glance

Quick facts

Quick facts about PVsyst and Solargis Evaluate
FactPVsystSolargis Evaluate
Runs as Desktop Verified Cloud Verified
Free plan No Verified Not found
Free trial Yes Verified Not found
Apps it connects to 10 named 5 named
Verified strengths Solar design, 3D modelling, Shade analysis Verified Solar design, 3D modelling, Shade analysis Verified

Which should you choose?

Built from the fit ratings in each review. It is not a verdict.

Choose PVsyst if

  • Business (commercial) installers
  • EPCs (design and build firms)
  • Detailed 3D shade and loss modelling suit business roofs.
  • Engineers use the report to back up the energy numbers in a contract.
  • One license is CHF 700 a year with a one-month free trial.

Trade-off: Windows desktop only.

Choose Solargis Evaluate if

  • Credits, extra data services and consulting suit large developers.
  • Solargis Evaluate is cloud software you use in a browser.

Trade-off: High entry price.

Neither fits if you are

  • Solar sales teams
  • O&M and asset teams
  • Both reviews rate these as a weak fit.

Pricing comparison

Both charge the same way. The prices are in different currencies, or one page shows $ with no currency code. We do not convert prices, so compare them with care.

Pricing facts for PVsyst and Solargis Evaluate, as each company shows them
FactPVsystSolargis Evaluate
Starting price CHF 700 per license per year Verified EUR 12,000 per subscription Partial
How it charges Per license per year Per year subscription with project credits
Billing Per license per year. Yearly: CHF 700 per year Not stated
Free plan No Verified Not found
Free trial Yes Verified Not found
Paid add-ons Consulting sessions: CHF 700 per 2-hour session, up to 5 people, PVsystCLI: CHF 3,000 a year Extra credits, Full evaluation with Time Series data, Pxx values and uncertainty data
Official pricing View PVsyst pricing (opens in a new tab) View Solargis Evaluate pricing (opens in a new tab)
Last checked 6 October 2026 6 October 2026

Each price is shown as the company writes it, and we never change one currency into another. What you pay also depends on how many users you have, the plan tier, contract length, setup, training and the apps you connect.

Feature-by-feature comparison

All 19 differences, the ones most likely to matter first.

Verified Company claim Not offered Not found Could not read No data yet
What the labels mean
  • Verified means we checked it on the company’s own website. The label links to the page.
  • Company claim means the company says so, but we could not check it.
  • Not offered means the company says it does not do this.
  • Not found means we looked on the company’s website and did not find it. That does not prove it is missing.
  • Could not read means we could not open the company’s page. It says nothing about the product.
  • No data yet means we have not recorded this fact for that product. It says nothing about the product.
  • Basic and Advanced show how deep the company says a feature goes.
PVsyst and Solargis Evaluate, feature by feature
Feature PVsyst Solargis Evaluate
Battery sizing and modelling Advanced Verified : source for Battery sizing and modelling, opens in a new tab Not found : source for Battery sizing and modelling, opens in a new tab
Likely and worst-case power output (P50/P90) P50 is the output in a typical year. P90 is the output you can count on in a poor year. Not found : source for Likely and worst-case power output (P50/P90), opens in a new tab Basic Verified : source for Likely and worst-case power output (P50/P90), opens in a new tab
Energy report a bank will accept Lenders often ask an independent engineer (IE) to approve the power estimate. Not found : source for Energy report a bank will accept, opens in a new tab Basic Company claim : source for Energy report a bank will accept, opens in a new tab
Export to drawing programs (DXF/DWG files) DXF and DWG are file types that drawing programs open. Yes Company claim : source for Export to drawing programs (DXF/DWG files), opens in a new tab Not found : source for Export to drawing programs (DXF/DWG files), opens in a new tab
Inverter sizing Advanced Verified : source for Inverter sizing, opens in a new tab No data yet We have no fact on file for this product yet. That tells you nothing about the product.
Yearly power estimate Advanced Verified : source for Yearly power estimate, opens in a new tab Advanced Verified : source for Yearly power estimate, opens in a new tab
Automatic panel layout Advanced Verified : source for Automatic panel layout, opens in a new tab Advanced Verified : source for Automatic panel layout, opens in a new tab
Ground-mount and sun-tracking layout Advanced Verified : source for Ground-mount and sun-tracking layout, opens in a new tab Advanced Verified : source for Ground-mount and sun-tracking layout, opens in a new tab
Named weather and sunlight data source Advanced Verified : source for Named weather and sunlight data source, opens in a new tab Advanced Verified : source for Named weather and sunlight data source, opens in a new tab
Site view from satellite or aerial images Advanced Verified : source for Site view from satellite or aerial images, opens in a new tab Advanced Verified : source for Site view from satellite or aerial images, opens in a new tab
Shading analysis Advanced Verified : source for Shading analysis, opens in a new tab Advanced Verified : source for Shading analysis, opens in a new tab
Single-line diagram (the main wiring drawing) Not found : source for Single-line diagram (the main wiring drawing), opens in a new tab Not found : source for Single-line diagram (the main wiring drawing), opens in a new tab
Electronic signature No data yet We have no fact on file for this product yet. That tells you nothing about the product. Not found : source for Electronic signature, opens in a new tab
Payback and return calculation Advanced Verified : source for Payback and return calculation, opens in a new tab Not found : source for Payback and return calculation, opens in a new tab
Apps it connects to (named) 10 Verified : source for Apps it connects to (named), opens in a new tab 5 Verified : source for Apps it connects to (named), opens in a new tab
Public API (lets other apps connect) Advanced Verified : source for Public API (lets other apps connect), opens in a new tab Basic Company claim : source for Public API (lets other apps connect), opens in a new tab
How you get it Software Verified : source for How you get it, opens in a new tab Software and services Verified : source for How you get it, opens in a new tab
Desktop OS support Windows 8, 10 and 11. Not Citrix, Remote Desktop or Azure Virtual Desktop. Projects cannot sit in OneDrive, Google Drive or Dropbox. Verified : source for Desktop OS support, opens in a new tab No data yet We have no fact on file for this product yet. That tells you nothing about the product.
Web application No Verified : source for Web application, opens in a new tab Yes Verified : source for Web application, opens in a new tab
Free plan Free trial Verified : source for Free plan, opens in a new tab Not found : source for Free plan, opens in a new tab
Price shown on its website Published Verified : source for Price shown on its website, opens in a new tab Partly published Verified : source for Price shown on its website, opens in a new tab
Starting price CHF 700 per license per year Verified : source for Starting price, opens in a new tab EUR 12,000 per subscription Verified : source for Starting price, opens in a new tab
Price currency CHF Verified : source for Price currency, opens in a new tab EUR Verified : source for Price currency, opens in a new tab
Limit on projects No data yet We have no fact on file for this product yet. That tells you nothing about the product. 60 Verified : source for Limit on projects, opens in a new tab
How it charges Per user Verified : source for How it charges, opens in a new tab Per user Verified : source for How it charges, opens in a new tab
Homes Yes Verified : source for Homes, opens in a new tab No Verified : source for Homes, opens in a new tab
Who it is sold to Engineering firms and small installers Verified : source for Who it is sold to, opens in a new tab Developers Verified : source for Who it is sold to, opens in a new tab
Business and factory work C&I means commercial and industrial buildings. Yes Verified : source for Business and factory work, opens in a new tab Yes Verified : source for Business and factory work, opens in a new tab
Where it is sold Worldwide Verified : source for Where it is sold, opens in a new tab Worldwide Verified : source for Where it is sold, opens in a new tab
Status Active Verified : source for Status, opens in a new tab Active Verified : source for Status, opens in a new tab
Very large solar farms Utility-scale means plants that sell their power to the grid. Yes Verified : source for Very large solar farms, opens in a new tab Yes Verified : source for Very large solar farms, opens in a new tab
Report and file export Advanced Verified : source for Report and file export, opens in a new tab Advanced Verified : source for Report and file export, opens in a new tab

Scroll the table sideways to see both products. The feature names stay in place.

Where they are the same 13 facts
  • Yearly power estimate
  • Automatic panel layout
  • Ground-mount and sun-tracking layout
  • Named weather and sunlight data source
  • Site view from satellite or aerial images
  • Shading analysis
  • Single-line diagram (the main wiring drawing)
  • Report and file export
  • How it charges
  • Business and factory work
  • Where it is sold
  • Status
  • Very large solar farms

Pros and cons

Alternatives

Instead of PVsyst

Instead of Solargis Evaluate

Common questions

What is the main difference between PVsyst and Solargis Evaluate?

They differ most on free plan or trial. In total we found 19 differences and 13 things that are the same.

Which costs more, PVsyst or Solargis Evaluate?

Both use the same kind of pricing: per user. PVsyst starts at CHF 700 per license per year. Solargis Evaluate starts at EUR 12,000 per subscription. The prices are in different currencies, or one page shows $ with no currency code. We do not convert prices, so compare them with care.

Is PVsyst or Solargis Evaluate better?

PVsyst starts at CHF 700 per license per year. Solargis Evaluate starts at EUR 12,000 per subscription. PVsyst names 10 apps it connects to. Solargis Evaluate names 5. Main thing to weigh for PVsyst: Desktop only, one license per computer, and no sales tools. Main thing to weigh for Solargis Evaluate: High entry price, and no sales, CRM or proposal tools. We do not name a winner, because the right one depends on what you need.

Do PVsyst and Solargis Evaluate have a free plan or a free trial?

PVsyst: free plan: no, free trial: yes. Plans listed: PVsyst 8 Professional, Education, Training / Research, Student or Classroom, PVsystCLI and PVsystBasic (solar pumping). Solargis Evaluate: free plan: not found, free trial: not found. Plans listed: Evaluate subscription. Check what a free version leaves out.

Which apps should I check for PVsyst and Solargis Evaluate?

PVsyst names 10 apps: Meteonorm 9 (weather), NASA-Power (weather), PVGIS-TMY (weather), NLR/NSRDB TMY (weather), Solcast TMY (weather), SolarAnywhere TGY (weather), Solargis (weather), Bing Maps and OpenStreetMap, Optimizers in the database: AMPT, Huawei, Maxim, Sungrow, SolarEdge, TIGO and 3D scene import from CAD tools. Solargis Evaluate names 5 apps: Solargis Prospect, Solargis TMY and Time Series APIs, Solargis data via SFTP, PV Components Catalog and Copernicus and SRTM terrain models. Ask the company about any app not named.

How current is the information on this page?

Prices, plans and apps were read on 6 October 2026. In the table we read 12 facts on 6 October 2026, 6 facts on 28 September 2026 and 42 facts on 25 September 2026, each with its own source. The PVsyst review lists 9 sources and the Solargis Evaluate review lists 8. The reviews confirmed 9 of 13 features for PVsyst and 9 of 13 for Solargis Evaluate on the companies’ websites.

About this comparison

Last checked

Prices and plans come from each product’s review, checked on this date (the later of the two). Other feature facts in the table were last checked on 28 September 2026.

Companies change prices and features without warning. Check current terms with the company before you decide.

Built from our list of facts, never by hand. We only publish a pair with at least five real differences, and we turned down 61 others.

How we build comparisons

See the software on your shortlist.

Tell the SolarSoftwares team what you want in your solar software.

Your request goes by email to the SolarSoftwares team. A demo time is set only after we reply.